급수펌프 구동용 증기터빈 제어기의 신뢰성 검증을 위한 시뮬레이터 구현

A realization of simulator for reliability verification on turbine controller for boiler feed Pump

  • Choi, I.K. (Korea Electric Power Research Institute) ;
  • Jeong, W.J. (Korea Electric Power Research Institute)
  • 발행 : 2002.07.10

초록

A simulator had been developed and will be used for reliability verification on turbine control programs for boiler feed pump in power plant prior to its actual operation in field. A mathematical model on thermal dynamics pertaining to prime mover steam turbine and pump was realized and included in this simulator. Also, many design and operating data acquired from fields were utilized in order to decide mechanical and thermal dynamic characteristics such as friction loss windage loss and inertia. A user can decide closing or opening velocity of steam stop valves and steam regulation valves. This simulator is able to generate steam pressure, turbine speed, pump power.

키워드