Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 2001.11b
- /
- Pages.223-225
- /
- 2001
RTDS Simulation for the System Blackstart of the Honan Area
RTDS를 이용한 전계통 정전시 호남지역 시송전선로 검토
Abstract
When a wide area blackout occurres, reenergizing transmission lines should be done at first. The KEPCO(Korea Electric Power Corporation) divides whole power system grid Into seven subsystem. This paper describes the investigation of facts, such as voltage rising and system stability, which occur in case that the blackstart plant of the Honam area will be displaced from Juam H/P to Seojingang H/P.
Keywords