RTDS Simulation for the System Blackstart of the Honan Area

RTDS를 이용한 전계통 정전시 호남지역 시송전선로 검토

  • Bong, O.Y. (Korea Electric Power Research Institute) ;
  • Kim, K.D. (Korea Electric Power Research Institute) ;
  • Lee, M.R. (Korea Electric Power Research Institute) ;
  • Lee, N.H. (Korea Electric Power Research Institute)
  • Published : 2001.11.16

Abstract

When a wide area blackout occurres, reenergizing transmission lines should be done at first. The KEPCO(Korea Electric Power Corporation) divides whole power system grid Into seven subsystem. This paper describes the investigation of facts, such as voltage rising and system stability, which occur in case that the blackstart plant of the Honam area will be displaced from Juam H/P to Seojingang H/P.

Keywords