대한전기학회:학술대회논문집 (Proceedings of the KIEE Conference)
- 대한전기학회 2001년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
- /
- Pages.488-490
- /
- 2001
계통측에서 본 풍력발전단지 도입에 따른 해결과제 및 대책연구
Problem and Solution of Wind Farm based on Distribution Power system
- Yoon, G.G. (KEPRI) ;
- Park, S.M. (KEPRI) ;
- Hyu, E. (KEPCO) ;
- Jung, S.B. (KEPCO) ;
- Kim, H.P. (Kyung Il Univ.) ;
- Lee, S.H. (Dae Duk Univ.)
- 발행 : 2001.04.19
초록
A dispered power system means a little bit of small power generation equipment located near the power-damend areas. Due to no power supply line, such a power source is very favorable for the decrease in loss of electric power supply, in comparison to the giantly focused power source, Because of small power source, this power source also corresponds promptly to the variation of power demend. On the basis of energy saving, environmental reservation, and utilization of natural or unused energy, solar power plants can be introduced into the residence section of cities and small water or wind-power plants near the urban areas. In case of Korea, some wind farm have been introduced into Cheju island, Condensed introduction of several small power sources into an used distribution line may, however, result in a big problem, it is, therefore, necessary that protective-cooporative plans between power quality and distribution line should be introduced for efficient utilization of KEPCO distribution system.
키워드