Abstract
This study presents the simulation of the traction return current based on 2${\times}$25kV power supply system in order to determine the impedance bond intensity of impulse type track circuit on the Kyoungbo electrification line. The results of simulation enables us to measure the precise intensity of catenary current, returning to the substation through KTX (Korean Train Express) operated by 2${\times}$25kV power supply system with common earth network. In the wake of establishing 2${\times}$25kV and common earth network used in Korea for the first time, in particular, it is possible to determine the impedance bond intensity of impulse type track circuit, which is applicable to the Kyoungbo electrification line by specifying the relations among the traction return current, earth current, and catenary current.