Proceedings of the Korea Concrete Institute Conference (한국콘크리트학회:학술대회논문집)
- 2001.11a
- /
- Pages.909-912
- /
- 2001
Investigation on the Validities of Removal Time of the Forms Considering Rebound Number of P Type Shumidt Hammer
P형 슈미트 햄머의 반발도를 이용한 거푸집 탈형시기의 결정에 관한 타당성 검토
Abstract
This paper presents the validities of the removal time of side forms considering the relationship between rebound number of P type schmidt hammer and compressive strength. According to test results, compressive strength of 40% of W/C at 12 hours shows 16kgf/
Keywords