A Suggestion of New Approach for Measurement of Remaining Prestress

잔존프리스트레스 측정을 위한 새로운 접근법 제안

  • 이창수 (서울시립대학교 토목공학과) ;
  • 김승익 (후레씨네 코리아 기술부) ;
  • 김현겸 (서울시립대학교 토목공학과)
  • Published : 2001.11.01

Abstract

The new approach is a kind method of restoring temporary defect. Here, it is important for the defect not to occur problems of both local effect and global system. A basic concept is that it measures remaining prestress of PSC structures during the defect is restored. This study suggested new approach for measurement of remaining prestress. Two important results are obtained. First, safety problems, local stress concentration and global system, are very satisfied. Second, measurement value exists within error bound $\pm$ 1% in comparison with known value.

Keywords