The Configuration of Work Breakdown Structure and Part Breakdown Structure for Light Railway Transit System

경량전철시스템 작업분류구조 및 부품분류구조 구성

  • Published : 2000.05.01

Abstract

The system is defined as groups which are operative, dependentive, configurational of all each others. In oner to develop the AGT system efficiently, the system engineering process has to be organized It will be started by the configuration of WBS and PBS. A WBS is a method of naming and organizing all of the wok elements to be done for a projects. It completely defines the projects, is normally prepared in an hierarchical during design and project execution. A number, or alpha-numeric identification, is assigned to every WBS elements. Also a hierachy of system physical components should be established. It named to PBS, which is a method of naming and organizing all of the physicals elements to be done far a projects. Therefore we will propose the WBS and PBS to fit for AGT system in this reports.

Keywords