Implementation of Performance Monitoring System for Thermal Power Plant in SIEMENS DCS

SIEMENS DCS 환경에서 화력발전소 성능감시 시스템 구현

  • 김승민 (한국중공업(주) 기술연구원 기전기술연구실) ;
  • 문태선 (한국중공업(주) 기술연구원 기전기술연구실) ;
  • 조창호 (한국중공업(주) 기술연구원 기전기술연구실)
  • Published : 2000.10.01

Abstract

This paper introduces the Performance Monitoring System(PMS) in a thermal power plant. The purpose of the PMS is to offer the operator current performance information of plant which could be an index of plant status or information to improve plant efficiency. The PMS of Bukcheju thermal power plant unit #2&3 is implemented under the SIEMENS DCS which supplies about 150 function blocks for performance calculation and all measured signals. The performance of unit, boiler, turbines, feedwater heaters, condenser, airpreheaters, feedwater pumps will be monitored and updated for every 5 minutes in PMS of Bukcheju TPP.

Keywords