Mostly, the economic analyses for replacement of major components of nuclear power Plants(NPPs) have been performed in deterministic ways. However, the analysis results are more or less affected by the uncertainties associated with input variables. Therefore, it is desirable to use a probabilistic economic analysis method to properly consider uncertainty of real problem. In this paper, the probabilistic economic analysis method and decision analysis technique are briefly described. The probabilistic economy analysis method using decision analysis will provide efficient and accurate way of economic analysis for the repair and/or replace mai or components of NPPs.

원자력발전소 주요기기의 교체에 대한 경제성평가는 대부분 결정론적 방법으로 수행하고 있으나 불확실성을 가진 입력변수에 따라 결과 값이 매우 가변적일 수 있다. 현실세계의 불확실성을 보다 면밀히 고려하기 위해 확률론적 방법을 활용하고 있다. 본 논문에서는 decision analysis를 이용하여 원자력발전소 기기 교체에 대한 경제성평가를 확률론적 방법으로 수행하였다. Decision analysis는 불확실성과 위험에 직면한 선택을 이끄는 기회를 이성적으로 개선하기 위한 방법론이며, 확률론과 통계이론이 복합되어 있다. Decision analysis의 주요요소는 여러 가지 방안 중 선택한 대안, 선택으로부터 결정된 결과, 그리고 다른 대안과 비교해서 상대적인 우선순위이다. 또한, decision analysis는 값, 불확실성, 그리고 위험도를 구조적으로 통합하는 원리를 제공한다. Decision analysis의 중요한 이점은 이러한 불확실성과 위험도에 대한 처리에 있으며, 모델은 influence diagram과 decision tree를 이용하여 작성한다. 본 논문에서는 decision analysis를 이용하여 국내 A형 원자력발전소 증기발생기의 최적교체시기를 결정하여 보았다. 이러한 방법은 향후 원자력발전소 주요기기의 교체에 관한 경제성평가시 적용할 수 있을 것으로 기대된다.

Keywords