시공 단계를 고려한 터널의 역해석에 관한 연구

Back Analysis of Tunnel for multi-step Construction

  • 김선명 (인하대학교 지구환경공학부 암반공학연구실) ;
  • 윤지선 (인하대학교 지구환경공학부)
  • 발행 : 2000.11.01

초록

The reliable estimation of the system parameters and the accurate prediction of the system behavior are important to design tunnel safely and economically. Therefore, the back analysis using the field measurements data is useful to evaluate the geotechnical parameter for tunnel. In the back analysis method, the selection of initial value and uncertainty of field measurements influence significantly on the analysis result. In this paper, to overcome uncertainty of field measurements, we performed the back analysis using the displacement data gained at each step of excavation and support.

키워드