대한전기학회:학술대회논문집 (Proceedings of the KIEE Conference)
- 대한전기학회 2000년도 하계학술대회 논문집 A
- /
- Pages.391-393
- /
- 2000
규제완화된 전력시장 하에서의 전력계통 신뢰도를 고려한 경제부하배분
Economic Load Dispatch Considering Power System Reliability under the Deregulated Electricity Market
- 김홍식 (경상대학교 전기공학과) ;
- 임채현 (경상대학교 전기공학과) ;
- 최재석 (경상대학교 전기공학과) ;
- 차준민 (대진대학교 전기공학과) ;
- 노대석 (한국기술교육대학교 전기공학과)
- Kim, Hong-Sik (Gyeongsang National University) ;
- Lim, Chae-Hyeun (Gyeongsang National University) ;
- Choi, Jae-Seok (Gyeongsang National University) ;
- Cha, Jun-Min (Daejin University) ;
- Rho, Dae-Seok (Korea University of Technology & Education)
- 발행 : 2000.07.17
초록
This paper presents an new algorithm for the economic load dispatch considering the reliability level constraints of composite power system under deregulated electricity market. It is the traditional ELD problem that generation powers have been dispatched In order to minimize total fuel cost subjected to constraints which sum of powers generated must equal the received load and no violating lower and upper limit constraints on generation. Under deregulated electricity market, however, generation powers of a pool have to be reallocated newly in order to satisfy the reliability differentiated level required at a load point because of a reliability differentiated electricity service which is a part of the priority service. In this study, new economic load dispatch algorithm for reallocating the generation powers of a pool in order to satisfy the reliability differentiated level under deregulated competitive electricity market is proposed. The uncertainties of not only generators but also transmission lines are considered fer the reliability evaluation. The characteristics and effectiveness of this methodology are illustrated by the case studies on MRBTS and IEEE-RTS.