Probabilistic Risk Assessment System Model and Methods for Construction Projects

건설공사의 확률적 위험도분석 시스템 모형 및 해석방법

  • 조효남 (한양대학교 토목·환경공학과) ;
  • 최현호 (한양대학교 토목·환경공학과) ;
  • 김윤배 (한양대학교 토목·환경공학과)
  • Published : 1999.04.01

Abstract

This paper presents probabilistic risk assessment system model and methods for general construction projects and demonstrates the applicability of the approach to a specific subway construction project. The proposed system model entitled Integrated Risk Assessment System(IRAS) for construction projects is composed of four steps, which is newly reorganized and improved in order to be easily adjusted for a systematic PRA of construction projects. Based on the proposed model, and integrated prototype software is then developing for computer-aided PRA of construction projects under the environment of the graphic-user interface, which will be successfully applied to construction projects.