The analysis result of temporary operation of 765 kV transmission line as 345 kV rating

765 kV 송전선로의 345 kV 운전에 따른 계통 해석

  • Woo, J.W. (KEPRI (Korea Electric Power Research Institute)) ;
  • Shim, E.B. (KEPRI (Korea Electric Power Research Institute)) ;
  • Kang, Y.W. (KEPRI (Korea Electric Power Research Institute))
  • Published : 1998.07.20

Abstract

This paper describes the power frequency voltage and its countermeasure when a 765 kV transmission line is directly connected to a 345 kV line and operated at 345 kV voltage. The summary of this result is as follows : The western route of 765 kV transmission line doesn't need any countermeasure to reduce the power frequency voltage at the receiving end. The eastern route of 765 kV transmission needs 100 Mvar(3 phase) capacity of shunt reactor at the receiving end to reduce the power frequency voltage. The use of shunt reactors in the 765 kV transmission lines has unexpected problems, one of which is induction of high voltages on a de-energized circuit of two parallel lines. This paper examined the problem of resonance on two parallel transmission circuits in one routes.

Keywords