Proceedings of the Korean Geotechical Society Conference (한국지반공학회:학술대회논문집)
- 1997.10a
- /
- Pages.203-210
- /
- 1997
Design and Construction of very deep diaphragm wall by the method of end concrete hardening with crushed stone pouring
선단고결 쇄석 투입 공법에 의한 초대심도 지중연속벽의 설계 및 시공
- Hwang, Hak (Institute of Construction Technology, LG Construction Co., Ltd) ;
- Lee, Wan-Jae (Institute of Construction Technology, LG Construction Co., Ltd) ;
- Choo, Seok-Yeon (Institute of Construction Technology, LG Construction Co., Ltd) ;
- Cho, Kyung-Yeon (Institute of Construction Technology, LG Construction Co., Ltd) ;
- Kim, Yu-Seok (Institute of Construction Technology, LG Construction Co., Ltd)
- Published : 1997.10.01