Determination of Hot Leg Recirculation Switchover Time to Prevent Boron Precipitation during Post-LOCA LTC for ULCHIN l&2

  • Published : 1996.11.01

Abstract

Boric acid concentrations of the refueling water storage tank (RWST) and the accumulators for Ulchin 1&2 (UCN 1&2) are increased to meet the post loss of coolant accident (post-LOCA) shutdown requirement for the extended fuel cycles from 12 months to 18 months. To maintain long term cooling (LTC) capability following a LOCA, the switchover tine is examined using BORON code to prevent the boron precipitation in the reactor core with the increased boron concentrations. The analysis results show that, at 8 hours after the initiation of LOCA. the emergency core noting system (ECCS) should be manually realigned to the simultaneous recirculation mode from the cold leg recirculation mode.

Keywords