Prediction and Compensation of Differential Column Shortening in High-Rise Building Structures

고층건물 기둥의 부등축소량 예측 및 시공오차 보정에 관한 연구

  • Published : 1996.10.01

Abstract

The purpose of this study is to make a reasonable correction in construction stage through exact prediction of long-time differential column shortening that occurs in the high-rise RC building. For this, a self-developed program adopted PCA code is used to predict differential column shortening with sequential loading process. Using this program, the amount of the different column shortening of Amatapura Apartment in Indonesia is predicted and the effect is analyzed. From the result, the major factor affecting the shortening amount in columns is elastic strain and the effect of shrinkage is very small rather than creep. And maximun differential column shortening is appeared near the middle of the building.

Keywords