Proceedings of the Korean Society for Technology of Plasticity Conference (한국소성가공학회:학술대회논문집)
- 1996.03a
- /
- Pages.101-109
- /
- 1996
Development of a Finishing-Mill Set Up Program for Calculating Pass Schedule In Mini Process
미니밀 마무리압연기의 Pass Schedule 설정 프로그램 개발
Abstract
Mini-mill process which is one of the new steel -marking technologies to be able to produce the hot rolled coils by thin slab caster of ISP(In-Line Strip Production) type, will be completed in the Kwangyang Steel Works of POSCO in August, 1996, SEt-Up Model of finishing mill which consists of 5 stands is the most basic and essential in mini-mill plant. Therefore, the simulation program of Finishing-mill Set-Up model were developed in this research , using new temeprature prediction model, roll gap model and rolling physical model. Using the developed FSU program , pass schedules to produce the strips with target strip thickness of 1.8mm, 2.0mm, 2.3mm, 2.7mm an d3.0mm were also determined respectively.