The Development of Production Simulation Methodology by Optimization Technique and It's Application to Utility Expansion Planning

최적화 기법에 의한 발전시뮬레이션 방법론의 개발 및 전원확충계획 문제에의 적용

  • Song, K.Y. (Department of Electrical Engineering Korea Univ.) ;
  • Oh, K.H. (Department of Electrical Engineering Korea Univ.) ;
  • Kim, Y.H. (Department of Electrical Engineering Inchon Univ.) ;
  • Cha, J.M. (Department of Electrical Engineering Daejln Univ.)
  • Published : 1996.07.22

Abstract

This study proposes a new algorithm which performs a production simulation under various constraints and maintains computational efficiency. In order to consider the environmental and operational constraints, the proposed algorithm is based on optimization techniques formulated in LP form In the algorithm, "system characteristic constraints" reflect the system characteristics such as LDC shape, unit loading order and forced outage rate. By using the concept of Energy Invariance Property and two operational rules i.e. Compliance Rule for Emission Constraint, Compliance Rule for Limited Energy of Individual Unit, the number of system characteristic constraints is appreciably reduced. As a solution method of the optimization problem, the author uses Karmarkar's method which performs effectively in solving large scale LP problem. The efficiency of production simulation is meaningful when it is effectively used in power system planning. With the proposed production simulation algorithm, an optimal expansion planning model which can cope with operational constraints, environmental restriction, and various uncertainties is developed. This expansion planning model is applied to the long range planning schemes by WASP, and determines an optimal expansion scheme which considers the effect of supply interruption, load forecasting errors, multistates of unit operation, plural limited energy plants etc.

Keywords