배전선로의 무정전공법 개발 연구

A study on the development for the method without interruption of service in the distribution system

  • 김영래 (한전 전력연구원 전력연구실) ;
  • 박구범 (한전 전력연구원 전력연구실) ;
  • 송일근 (한전 전력연구원 전력연구실)
  • 발행 : 1995.11.18

초록

The main factors to bring out the power failure are trouble and operation power failure, the operation power failure of these includes about 85%. So, it is required that the without interruption of service method reduce the operation power failure. If we develop the without interruption of service method, the operation power failure will reduce greatly. It is necessary to develop the without interruption of service method which it solve various trobles (dissatisfacting solution of customer, sales revenue augmentation, and the reduction of the power failure negotiation work). The results of study are drawing up of the specification for temporary transmission methods, it of the working methods for them, and the scrutiny of the technology contents for them.

키워드