서울지하철 6호선 건설계획

Planning and Design of Seoul Subway Line 6

  • 발행 : 1993.10.01

초록

To ease traffic congestion Seoul Metropolitan Government formulated the 2nd Phase of Seoul Subway Construction Scheme in 1989. The scheme calls for the construction of %60 km of subway which includes addition of 4 more subway lines and extension of 3 existing subway lines in addition to the existing 118 km of subway. As a final stage of the scheme subway line 6 is under planning and design. The line 6 is 36.1 km-long route connecting Ungam-Samgakchi-Changsin-Sinnae. Except for the depot main line wilts be underground and major construction methods are cut and cover and tunnelling. As a tunnelling method New Austrian Tunnelling Method will be adapted. The line will be opened by the end of 1997. With the completion of the line Seoul will have 278 km of subway network and the transport share by subway will be increased from 25% in 1992 to 50% in 1997.

키워드