한국농업기계학회:학술대회논문집 (Proceedings of the Korean Society for Agricultural Machinery Conference)
- 한국농업기계학회 1993년도 Proceedings of International Conference for Agricultural Machinery and Process Engineering
- /
- Pages.158-173
- /
- 1993
MECHANISATION SYSTEM FOR LARGE SCALE GRAIN MAIZE PRODUCTION IN MALASIA
- Abu-Hassan, D. (Division of Agricultural Engineering MARDI Seberang Perai Bag Berkunci) ;
- Nor, J.M. (Division of Agricultural Engineering MARDI Seberang Perai Bag Berkunci) ;
- Daham, M.D.M. (Director Division of Agricultural engineering Malysian Agricultural and Development Institute)
- 발행 : 1993.10.01
초록
The formulated mechanization packages for grain maize production have performed to the expected limit generating encouraging information. Besides physical feasibility , management factors viz ; production operation sequence, operations scheduling and machinery matching with respect to environment can still limit system suitability. A new production operation sequence was introduced to overcome weed problems and limitations of available working days. Proper operations scheduling will improve the initial soil-crop environment for better seedling establishment, and reduce the (). been identified as key factors to reduce capital investment and cost of proudction .