전력계통 계획용 최적운전 모델

Constrained Economic Dispatch for Planning purpose

  • 발행 : 1992.07.23

초록

Optimal generation dispatch algorithm is developed using L.P and load dispatch method. The algorithm is composed with three steps. Fist phase, analytical algorithm is adopted to solve to minimize quadratic cost functions which fits well for planning purpose. Second phase uses L.P method for obtain economic redispatch that satisfies line constraints. When there is no solution whitch satisfy line constraints load shedding algorithm solves the problem.

키워드