전압 및 무효전력 계획의 최적화에 관한 연구

A Study on Optimization of Voltage and Reactive Power Planning

  • 발행 : 1988.07.01

초록

This paper discusses one overall reactive power installation pattern that will satisfy system performance constraints for base case. The cost of installation is minimized, Existing controllers are fully utilized prior to any addition of new installation. Installation pattern for the required new shunt compensation is comprised of discrete, standard size components.

키워드